Skip to content
Scope123

GHG Protocol opens Scope 2 consultation on hourly matching

The GHG Protocol opened a 60-day Scope 2 Guidance consultation on 20 October 2025, proposing hourly matching and deliverability for market-based reporting.

Factors & dataScope123 News Desk

If you prepare or assure Scope 2 figures, the rules behind both the location-based and market-based numbers are open for comment. The GHG Protocol opened a 60-day public consultation on 20 October 2025 on revisions to its Scope 2 Guidance, first published in 2015. The period was set to run to 19 December 2025 and was later extended to 31 January 2026. Feedback is taken only through the online survey forms on the GHG Protocol's public consultations page.

What's proposed for market-based Scope 2

Dual reporting stays. The main change is to the market-based method: contractual instruments such as renewable energy certificates would have to be matched to consumption hour by hour, and come from generation that can plausibly be delivered to where the electricity is used.

To make that workable, the proposal includes load profiles to approximate hourly data, exemption thresholds for smaller organisations, a legacy clause for existing contracts and a phased start over several years. A September 2025 overview said initial analysis suggests most CDP reporters would be exempt while most grid load would still be subject to hourly matching. It also proposes capping claims on standard utility supply at each reporter's pro-rata share, updating the residual mix definition, and removing the grid-average fallback where no residual mix exists, requiring fossil-only rates instead.

What's proposed for location-based Scope 2

A new emission factor hierarchy would put spatial precision first, then time precision, and favour consumption-based factors (which count imports and exports) over production-based ones. Organisations would have to use the most precise factor they can access, defined as free, public and from a credible source, where they have matching activity data.

Timing

A second public consultation on Scope 2 topics is planned for 2026, with the new standard expected in 2027. The September overview said no new location-based or market-based requirements would apply before outcomes from the separate Actions and Market Instruments work are available. A companion consultation on consequential accounting for the electricity sector opened on the same day.

More from Factors & data