NGER 2025 update sets new state Scope 2 electricity factors
The NGER Measurement Determination 2025 update, announced 17 June 2025, revises state Scope 2 factors for 2025–26, with Tasmania up from 0.15 to 0.20 kg/kWh.
If you calculate location-based Scope 2 for electricity used in 2025–26, the state grid factors have changed. The Clean Energy Regulator announced the NGER amendments for the 2025–26 reporting year on 17 June 2025. They are made by the National Greenhouse and Energy Reporting (Measurement) Amendment (2025 Update) Determination 2025, registered on 13 June 2025.
The CER's amendments page lists the location-based factors, in kg CO2-e/kWh, moving from 2024–25 to 2025–26:
- NSW and ACT: 0.66 to 0.64
- Victoria: 0.77 to 0.78
- Queensland: 0.71 to 0.67
- South Australia: 0.23 to 0.22
- WA (South West Interconnected System): 0.51 to 0.50
- Tasmania: 0.15 to 0.20
- NT: unchanged at 0.56
Market-based changes
The update also changes the market-based method. A controlling corporation that uses it must now use it for every facility in its group. The timing for surrendering renewable energy certificates counted in market-based figures is clarified, and reporters must give RET accreditation codes for power stations within a facility and the REC Registry surrender ID numbers for certificates they rely on. Biomethane and hydrogen consumption can now be reported on a market basis.
The changes apply to 2025–26 reports and don't affect 2024–25 reports.
More from Factors & data
- Factors & dataScope123 News Desk
GHG Protocol Scope 2 feedback: low support for hourly matching
Nearly 1,100 responses from 56 countries gave low support to hourly matching and deliverability, the GHG Protocol's 29 July 2026 Scope 2 feedback summary says.
- Factors & dataScope123 News Desk
GHG Protocol opens Scope 2 consultation on hourly matching
The GHG Protocol opened a 60-day Scope 2 Guidance consultation on 20 October 2025, proposing hourly matching and deliverability for market-based reporting.
